Scheduling Queries
With the Schedule Query screen, you can specify when a query is to run by adding it to schedule groups (as shown in Defining Groups of Items) or removing it from them.
To schedule a query, type S in the Opt field for that query on the Work with Queries screen (
The screen also appears in the process of adding or modifying queries if the Schedule Query field on the Exit Query Definition screen is set to Y (as shown in Adding and Modifying Queries).
Schedule Query Query . . . . . TESTJZ Test for Documentation Type options, press Enter. 1=Add 4=Remove Opt Group Description A TEXT FOR A DAILY Daily DAILYGU Daily, for GUI output (EXCEL like, preformatted) DAILYML Daily, in HTML, sent by Email GUI TEXT FOR GUI > QQ Test RR TEXT FOR RR TELNET Check of Z6TELNET Quiery TSTDAY Daily > TSTGRP Test group More... F3=Exit F12=Cancel |
The read-only Query field shows the name and text description of the query being scheduled.
The body of the screen contains a line for each of the existing schedule groups. In each, the Group field shows the name of the group and the Description field shows a text description.
If a group contains the query being scheduled, its Group field is preceded by an open-arrow (the ">" character).
To add the query to a schedule group, type 1 in the Opt field for that group and press Enter.
To remove the query from a schedule group, type 4 in the Opt field for that group and press Enter.